08/10/1999

Correspondence dated 8/10/99

11/16/99 No change in status. Informed that Rel still wants the FPS's changed into ES 2810s on the 8th floor Dow.
4/10/01 informed that Dolan is experiencing performance problems, and that he suspects the hubs.
4/11/01 Per Steve: "Please add the following to the NED and create a work order for it's installation:1 ES289 141.219.56.26 002048740863 08 2NDFLN DOW"
5/15/01 informed that Stan and Bob reviewed closets, have list of needs (equipment, cables, etc.)
5/22/01 informed that Stan had given plan to Kurt, calling for 23 switches. Kurt will have Jean begin cabling.
6/12/01 informed that the cable had been installed.
7/2/01 Correspondence dated 7/2/01
7/17/01 informed that Stan and Steve to replace switches this week.

 

MICHIGAN TECH | INFORMATION TECHNOLOGY
Last Revised: 08/21/2001
Copyright © 2000. All Rights Reserved. Michigan Tech IT Telcom
Please email the webmaster at tcweb@mtu.edu with questions or comments about this site.