Date
|
Details
|
| 1/24/2000 | Per Dan on 1/24/2000 --Estimates are needed ASAP for wiring the 8th and 9th floors of the MEEM |
| 2/01/2000 | As of 2/1/2000--informed that Kurt gave Chris maps to review and that he is waiting to hear from her before proceeding on this project |
| 2/08/2000 | As of 2/8/2000 staff meeting -- Kurt has completed a preliminary estimate for this project. Also, work is progressing on getting the additional closet space and renovations to that space. |
| 2/16/2000 | Correspondence |
| 2/22/2000 | As of 2/22/00 staff meeting-- It was determined that everything from the 9th floor will get cabled down to the 8th floor. Discussed patch cables and it was determined to focus on using the Cat5E for the time being. All to do testing of Cat5E. |
| 2/24/2000 | New Switches added to 8th floor MEEM closet |
| 2/24/2000 | New Switches added to 9th floor MEEM closet |
| 2/28/2000 | Correspondence regarding network gear |
|