Project Documentation for P-2001-0009

Date
Details
4/23/01 Per Steve: "Please add the following to the NED and create a work order for it's installation:1 ES2K009 141.219.112.130 002048820006 07 B50 EERC ESR001 P6.02"
4/25/01 Per Steve: "Please add the following to the NED and create a work order for it's installation:1 ES290 141.219.112.138 00204874097D 07 B50 EERC ES2K009 P3.08"
6/12/01 Informed that the wire is pulled, terminated, and tested. Bob G. is assisting the students.

 